How MRP Live (MD01N) Runs on S/4HANA with S4CORE after Logistics Simplifications by Sarhan Polatates
MRP on HANA FAQ in SCN by Caetano Almeida
What are the Business Process changes to run MRP in real-time rather than in batch processes?
Real-Time Value for Manufacturing powered by SAP HANA
MRP Live: Incompatible Changes - Carrying Out the Planning Run Using MRP Live - SAP Library
Real Time Inventory with SAP S/4HANA - YouTube
Can we run MRP in a SAP HANA side car?
No, MRP can only be run directly on a SAP S/4HANA system. You could replicate the tables from a ERP on AnyDB system to a SAP HANA sidecar system, but the MRP algorithm needs the complete S/4HANA system to run and to persist the results.